Sunday, August 11, 2019 – Saturday, August 17, 2019: Project Update & Photos

Roadway looking south at Hayes/Minnesota Ave junction with base asphalt installed.

Preparation for pervious concrete side walk on west of Minnesota Ave.

Ongoing bioretention structure work.

The contractor did the following work: Installation of curb and gutter, sidewalks and handicap ramps at NW corner of Minnesota Ave, NE and Benning Rd, NE intersection; continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps and brick pavers at the WMATA “Park, Kiss, “N” Ride” parking lot; continued installing granite curb & concrete gutter for median island on Benning Rd east of Minnesota Ave, NE;; pulled electric cable on Minnesota Ave, NE for streetlights and traffic lights; Benning Rd west of Minnesota Ave, NE; Washington Gas line relocation along Minnesota Ave between Hunt Pl and Hayes St

Sunday, August 05, 2019 – Saturday, August 10, 2019: Project Update & Photos

Ongoing base asphalt work middle portion of Beinning Rd west of the Minnesota Ave/Benning Rd intersection.

Ongoing roadway work @ Benning Rd west of Minnesota Ave.

Ongoing installation of MHA base asphalt for middle portion of roadway pavement of Minnesota Ave (Sta. 147+50 – 152+75).

The contractor did the following work: Continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps and brick pavers at the WMATA “Park, Kiss, “N” Ride” parking lot; excavated and installed granite curb & concrete gutter for median island on Benning Rd east of Minnesota Ave, NE; continued with full depth excavation and reconstruction in the center lane of Minnesota Ave, NE from Gault Pl, NE to Hayes St, NE; pulled electric cable on Minnesota Ave, NE for streetlights and traffic lights; full depth excavation and reconstruction of existing middle lanes on Benning Rd west of Minnesota Ave, NE; Washington Gas line relocation along Minnesota Ave between Hunt Pl and Hayes St.

Sunday, July 29, 2019 – Saturday, August 03, 2019: Project Update & Photos

Roadway looking south at Hayes/Minnesota Ave junction with base asphalt installed.

Preparation for pervious concrete side walk on west of Minnesota Ave.

Ongoing bioretention structure work.

The contractor did the following work: Continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps and brick pavers at the WMATA “Park, Kiss, “N” Ride” parking lot and; continued with full depth excavation and reconstruction in the center lane of Minnesota Ave, NE from Gault Pl, NE to Hayes St, NE; full depth roadway reconstruction in the SW corner of Minnesota Ave and Benning Rd, NE intersection; Washington Gas line relocation along Minnesota Ave at Park 7/DOES  and between Hunt Pl and Hayes St.