Sunday, January 27, 2019 – Saturday, February 2, 2019: Project Update & Photos

Formed and intalled rebar for retaining wall footing on NW corner of Minnesota Ave/Nannie Helen Burroughs between Sta. 159+50 – 160+50.

Installation of trench drain at Sharks Plaza entrance driveway on the east side of Minnesota Ave Sta. 134+00.

Placing #57 aggregate base over sand based structural material for pervious side walk in the front of Metro Bus Depot on the west side of Minnesota Ave Sta. 139+50 – 141+50.

The contractor did the following work: Continued excavation and footing installation for retaining wall on the NW corner of Minnesota Ave/Nannie Helen Burroughs intersection; installed street light poles on both sides of Minnesota Ave between 4077 Minn. Ave and Metro Bus Depot Exit; completed sidewalk demolition on the west side of Minnesota Ave from the Metro Bus Depot Exit to the Entrance and placed aggregate base for sidewalk and edge restraint; installed trench drain at Sharks Plaza; continued Washington Gas line relocation along Minnesota Ave. 

Sunday, January 20, 2019 – Saturday, January 26, 2019 Update & Photos

Installation of wheelchair ramps at Sta. 139+30 WMATA Metro Bus Depo Exit.

Finishing concrete for wheelchair ramp at Sta. 142+40 WMATA Metro Bus Depot entrance.

Ongoing concrete pour.

 The contractor did the following work: clearing and grubbing for retaining wall on the NW corner of Minnesota Ave/Nannie Helen Burroughs intersection; Excavated and placed concrete for street light pole foundations and traffic signal pole foundations at the Metro Bus Depot; installed electrical conduit from electrical manhole to street light pole foundations; installed granite curb & PCC gutter on the west side of Minnesota Ave (in front of the Metro Bus Depot); installed trench drain concrete at Auto Zone parking lot and excavated for trench drain at Sharks Plaza parking lot; installed concrete wheelchair ramps at Metro Bus Depot on west side of Minnesota Ave; continued Washington Gas line relocation along Minnesota Ave. 

Sunday, January 13, 2019 – Sunday January 19, 2019: Project Update & Photos

Minnesota Ave. after removal of concrete jersey barrier.

Excavation and preparation for water main tie-in at Hunt Place by Exxon Gas station.

Excavation for water main tie-in.

 The contractor did the following work: Excavated sidewalk on the west side of Minnesota Ave (in front of the Metro Bus Depot) and installed curb, gutter; pervious concrete sidewalk, brick pavers, bio-retention walls, and capstone for brick wall, installed storm water PCC pipe and soil for planters; excavated and installed trench drain piping and concrete forms at Auto Zone parking lot on the east side of Minnesota Ave; repaired traffic signals at the intersection of Metro Bus Depot Exit and Minnesota Ave Station; continued Washington Gas line relocation along Minnesota Ave between Hayes St and Hunt Pl. 

Sunday, January 6, 2019 – Saturday, January 12, 2019: Project Update & Photos

Minnesota Ave. after removal of concrete jersey barrier.

Excavation and preparation for water main tie-in at Hunt Place by Exxon Gas station.

Excavation for water main tie-in.

The contractor did the following work: Placed aggregate base asphalt on excavated roadway sub-grade between Benning Rd intersection and Auto Zone; excavated sidewalk and installed pervious concrete sidewalk, brick pavers, bio-retention walls, and capstone for brick wall, installed storm water PCC pipe and soil for planters; continued Washington Gas line relocation along Minnesota Ave between Hayes St and Hunt Pl. 

Sunday, December 30, 2018 – Saturday, January 5, 2019: Project Update & Photos

 The contractor did the following work: Excavated roadway pavement on north bound lanes Minnesota Ave, (north side of Benning Rd intersection) and placed aggregate base asphalt on excavated roadway sub-grade between Benning Rd intersection and Auto Zone; excavated sidewalk and installed pervious concrete sidewalk, brick pavers, bio-retention walls, and capstone for brick wall, installed storm water PCC pipe and soil for planters; restriped pavement markings for lane divides, cross walks and stop bar between Benning Rd and Gault St on Minnesota Ave; opened east side sidewalk on Minnesota Ave in front of Friendship Collegiate School; continued Washington Gas line relocation along Minnesota Ave between Hayes St and Hunt Pl. 