Sunday, January 20, 2020 – Saturday, January  25, 2020: Project Update & Photos

Ongoing base asphalt work for southbound median lane.

Ongoing installation thermoplastic pavement marking work.

Ongoing catch basin connecting pipe work.

The contractor did the following work: Continued with the excavation of existing northbound curb lane pavement in front of Crown gas station continued planting shrubs & ground covers and mulching at NW corner of Minnesota Ave/Benning Rd intersection, in front of 7-Eleven, Yum’s Carryout,Rainbow store, and between building #3919; continued installing bike racks, park benches, and trash cans on Benning Rd; installed permeable concrete paver on the east side of Minnesota Ave from Nannie Helen Burroughs Ave toward Sheriff Rd; began excavating and installing fire hydrant on the west side of Minnesota Ave north of Nannie Helen Burroughs Ave intersection.

Sunday, January 13, 2020 – Saturday, January  18, 2020: Project Update & Photos

Pulling of traffic signal communication wire at Minnesota Ave/Dix St toward Benning Rd.

Ongoing electrical work.

Connecting traffic signal communication cable for traffic cabinet at Benning Rd.

The contractor did the following work: Continued with the excavation of existing northbound curb lane pavement in front of Crown gas station continued planting shrubs & ground covers and mulching at NW corner of Minnesota Ave/Benning Rd intersection, in front of 7-Eleven, Yum’s Carryout,Rainbow store, and between building #3919; continued installing bike racks, park benches, and trash cans on Benning Rd; installed permeable concrete paver on the east side of Minnesota Ave from Nannie Helen Burroughs Ave toward Sheriff Rd; began excavating and installing fire hydrant on the west side of Minnesota Ave north of Nannie Helen Burroughs Ave intersection.