Sunday, June 30, 2019 – Saturday, July 6, 2019: Project Update & Photos

Ongoing work Gault Pl to Hunt Pl NB curb lane Minnesota Ave.

New asphalt base for roadway pavement N/B curb lane from Gault Pl to Hayes St.

Asphalt and new driveway work in front of the WMATA Bus Depot Exit.

The contractor did the following work: Full depth roadway excavation and reconstruction of northbound curb lane on Minnesota Ave, NE between Grant St, NE and Gault Pl, NE; continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps and brick pavers on at Minnesota Ave and Benning Rd, NE intersection; Washington Gas line relocation along Minnesota Ave at Park 7/DOES and between Hunt Pl and Hayes St.

Sunday, June 23, 2019 – Saturday, June 29, 2019: Project Update & Photos

Ongoing installation of roadway pavement at intersection of Minnesota Ave/Benning Rd.

Newly installed wheelchair/bike ramps and sidewalk at SW corner of Minnesota Ave/Benning Rd. Sta. 128+00.

Installation of MHA base asphalt for roadway pavement at Gault Pl Sta. 46+10 – 47+06.

The contractor did the following work: Full depth roadway excavation and reconstruction of northbound curb lane on Minnesota Ave, NE between Grant St, NE and Gault Pl, NE; continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps and brick pavers on at Minnesota Ave and Benning Rd, NE intersection; Washington Gas line relocation along Minnesota Ave at Park 7/DOES and between Hunt Pl and Hayes St.

Sunday, June 16, 2019 – Saturday, June 22, 2019: Project Update & Photos

Newly intalled HMA base asphalt for middle portion lane of E Benning Rd.

Installation of 10” GAB for middle section of E Benning Rd Sta. 203+25 – 205+75

Ongoing installation of lime stone veneer wall for retaining wall #1 on S side of W Benning Rd.

The contractor did the following work: Full depth roadway excavation and reconstruction of southbound curb lane between Dix St, NE and Benning Rd, NE; continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps and brick pavers on at Minnesota Ave and Benning Rd, NE intersection; continued trench excavation for storm water main at the intersection of Minnesota Ave/Nannie Helen Burroughs Ave ; Washington Gas line relocation along Minnesota Ave at Benning Rd and between Hunt Pl and Hayes St.