Sunday, March 31, 2019 – Saturday, April 6, 2019: Project Update & Photos

Ongoing work Minnesota Ave/Grant Street.

Ongoing work on roadway subbase in front of school.

Ongoing subbase work.

The contractor did the following work: Continued installation of rebar for retaining wall on the SW corner of Minnesota Ave/Benning Rd intersection; continued full depth roadway excavation and reconstruction of northbound curb lane between WMATA/DOES access drive and Gault Pl; continued Washington Gas line relocation along Minnesota Ave at Benning Rd and between Hunt Pl and Hayes St.

Sunday, March 25, 2019 – Saturday, March 30, 2019 : Project Update & Photos

Exposed subgradenorthbound curb lane.

Installed drainable aggregate base northbound curb lane.

Ongoing placing of 4” drainable aggregate base northbound curb lane in the front of building #4077 Minn. Ave

The contractor did the following work: Continued installation of rebar for retaining wall on the SW corner of Minnesota Ave/Benning Rd intersection; excavated sidewalk on the east side of Minnesota Ave between Grant St, NE and Gault Pl, NE and installed curb, gutter; pervious concrete sidewalk and brick pavers; continued Washington Gas line relocation along Minnesota Ave at Benning Rd.

Sunday, March 17, 2019 – Saturday, March 23, 2019 : Project Update & Photos

Ongoing installation of pervious sidewalk in the front of property #4127, Minnesot Ave between Sta. 142+75 – 144+75.

Ongoing work on retaining wall #1.

Ongoing installation of pervious concrete sidewalk in the front of JA Auto Shop (Sta. 144+30 – 144+65).

The contractor did the following work: Continued installation of rebar for retaining wall on the SW corner of Minnesota Ave/Benning Rd intersection; excavated sidewalk on the east side of Minnesota Ave between Grant St, NE and Gault Pl, NE and installed curb, gutter; pervious concrete sidewalk and brick pavers; continued Washington Gas line relocation along Minnesota Ave at Benning Rd.

Sunday, March 10, 2019 – Saturday, March 16, 2019 : Project Update & Photos

Minnesota Ave. after removal of concrete jersey barrier.

Excavation and preparation for water main tie-in at Hunt Place by Exxon Gas station.

Excavation for water main tie-in.

The contractor did the following work: Continued excavation and footing installation for retaining wall on the SW corner of Minnesota Ave/Benning Rd intersection; installed curb, gutter; pervious concrete sidewalk and brick pavers on west side of Minnesota Ave at Grant St; continued excavating for pervious concrete sidewalk and planter boxes on the east side of Minnesota Ave between Grant St and Gault Pl; Continued placing temporary pavement lane marking on Benning Rd. and placed temporary crosswalk line at Minnesota Ave/Grant St. intersection; continued Washington Gas line relocation along  Minnesota Ave.

Sunday, March 3, 2019 – Saturday, March 9, 2019 : Project Update & Photos

Ongoing Wheelchair ramps installation on the westside of Minnesota Ave (Sta. 142+75 – 143+25) @ Metro Bus Depot Entrance.

Preparation for installation of cut thru wheelchair ramp for traffic island on the west side of Minnesota Ave. (142+75 – 143+25) at Metro Depot Entrance.

Installation of PVC drainage pipe behind retaining wall #3 at the NW corner of Nannie Helen Burroughs Ave/Minnesota Ave.

The contractor did the following work: Continued construction on biorientation wall on the west side of Minnesota Ave; excavated the traffic island at the Metro Bus Depot Entrance on the west side of Minnesota and installed curb and gutter; continued construction on retaining wall at SW corner of Minnesota Ave/Nannie Helen Burroughs intersection; installed sidewalk, curb, wheelchair ramps at traffic island by the Metro Bus Depot Entrance on the westside of Minnesota Ave; repaired pot holes at intersection of Minnesota Ave/Benning Rd, on westbound Benning Rd, and various location along Minnesota Ave; created temporary ramp with asphalt at the Park “N” Ride exit; continued Washington Gas line relocation along  Minnesota Ave.

error: Content is protected !!