Sunday, September 23, 2019 – Saturday, September 28, 2019: Project Update & Photos

Roadway looking south at Hayes/Minnesota Ave junction with base asphalt installed.

Preparation for pervious concrete side walk on west of Minnesota Ave.

Ongoing bioretention structure work.

The contractor did the following work: The contractor did the following work: Continued with full depth excavation from Watts Branch bridge to Nannie Helen Burroughs Ave, placed geotextile fabric on subgrade & drainable aggregate base asphalt for the south bound curb lane roadway pavement from Hunt Pl to Watts Branch Bridge; Placed surface asphalt in the north bound center lane of Minnesota Ave from the front of Auto Zone to WMATA bus depot

Sunday, September 16, 2019 – Saturday, September 21, 2019: Project Update & Photos

Roadway looking south at Hayes/Minnesota Ave junction with base asphalt installed.

Preparation for pervious concrete side walk on west of Minnesota Ave.

Ongoing bioretention structure work.

The contractor did the following work: Continued with full depth excavation from Watts Branch bridge to Nannie Helen Burroughs Ave, placed geotextile fabric on subgrade & drainable aggregate base asphalt for the south bound curb lane roadway pavement from Hunt Pl to Watts Branch Bridge; Washington Gas line relocation along Minnesota Ave between Hunt Pl and Hayes St.

Sunday, September 9, 2019 – Saturday, September 14, 2019: Project Update & Photos

Ongoing base asphalt work middle portion of Beinning Rd west of the Minnesota Ave/Benning Rd intersection.

Ongoing roadway work @ Benning Rd west of Minnesota Ave.

Ongoing installation of MHA base asphalt for middle portion of roadway pavement of Minnesota Ave (Sta. 147+50 – 152+75).

The contractor did the following work: Started full depth excavation from Watts Branch bridge to Nannie Helen Burroughs Ave, placed geotextile fabric on subgrade & drainable aggregate base asphalt for the south bound curb lane roadway pavement from Hunt Pl to Watts Branch Bridge; Installation of curb and gutter, sidewalks and handicap ramps at NW corner of Minnesota Ave, NE and Benning Rd, NE intersection; continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps andbrick pavers at the WMATA “Park, Kiss, “N” Ride” parking lot; continued installing granite curb &concrete gutter for median island on Benning Rd east of Minnesota Ave, NE;; pulled electric cable on Minnesota Ave, NE for streetlights and traffic lights; Benning Rd west of Minnesota Ave, NE; Washington Gas line relocation along Minnesota Ave between Hunt Pl and Hayes St.

Sunday, September 2, 2019 – Saturday, September 7, 2019: Project Update & Photos

Roadway looking south at Hayes/Minnesota Ave junction with base asphalt installed.

Preparation for pervious concrete side walk on west of Minnesota Ave.

Ongoing bioretention structure work.

The contractor did the following work: Installation of curb and gutter, sidewalks and handicap ramps at NW corner of Minnesota Ave, NE and Benning Rd, NE intersection; continued installation of curb and gutter, pervious concrete sidewalks, handicap ramps and brick pavers at the WMATA “Park, Kiss, “N” Ride” parking lot; continued installing granite curb & concrete gutter for median island on Benning Rd

east of Minnesota Ave, NE;; pulled electric cable on Minnesota Ave, NE for streetlights and traffic lights; Benning Rd west of Minnesota Ave, NE; Washington Gas line relocation along Minnesota Ave between Hunt Pl and Hayes St.